docs: v0.19.2 — AGENTS.md e2e section reflects CI-only runs; connected issues may be done together
CI / build + unit + e2e (pull_request) Successful in 7m5s
CI / build + unit + e2e (pull_request) Successful in 7m5s
This commit is contained in:
@@ -1,5 +1,9 @@
|
||||
# Changelog
|
||||
|
||||
## v0.19.2 — 2026-09-19 20:06
|
||||
- **AGENTS.md "Change process" item 1** — connected issues/tasks that reference the same part of code may now be done together on one branch/PR with a single version bump (e.g. two UI tweaks to the same panel)
|
||||
- **AGENTS.md "E2E tests" section rewritten to match current reality** — e2e runs ONLY in CI, against an isolated docker stack inside dind (`docker-compose.ci.yml`); there are NO local e2e runs at all (local verification = `tsc --noEmit` + `npx vitest run` + `npx playwright test --list`; the full suite is verified by CI on every PR). Dropped the stale local-run instructions (deploying to the Traefik-routed instance before testing, driving browsers through the remote Playwright server at 192.168.1.4:3000); kept and reworded the CI env vars that actually exist in `playwright.config.ts` (`E2E_BASE_URL`, `E2E_DEPLOY_CMD`, `PW_REMOTE_BROWSER=0`, `E2E_COMPOSE_ARGS`)
|
||||
|
||||
## v0.19.1 — 2026-09-19 18:48
|
||||
- AGENTS.md: document that CI-green is enforced on master by branch protection (required status check) and that merges use auto-merge (`merge_when_checks_succeed`) so PRs merge automatically once CI passes
|
||||
|
||||
|
||||
Reference in New Issue
Block a user